Lee Duna@lemmy.nz to Technology@lemmy.zipEnglish · 8 months agoSwiss hydrogen-powered train sets 1741-mile record for nonstop travelinterestingengineering.comexternal-linkmessage-square62fedilinkarrow-up1144arrow-down12
arrow-up1142arrow-down1external-linkSwiss hydrogen-powered train sets 1741-mile record for nonstop travelinterestingengineering.comLee Duna@lemmy.nz to Technology@lemmy.zipEnglish · 8 months agomessage-square62fedilink
minus-squareSupraMario@lemmy.worldlinkfedilinkEnglisharrow-up1·8 months agoAlmost everyone of them is done with a generator. Or they’re done with the crane and inspections for power have been completed and the crane is no longer needed.
minus-squareIlovethebomb@lemm.eelinkfedilinkEnglisharrow-up1·8 months agoDude, you’re full of shit. Every construction site I’ve been on has had site power.
minus-squareSupraMario@lemmy.worldlinkfedilinkEnglisharrow-up1·8 months agoCool, sounds like you’ve never stepped foot outside of the city.
minus-squareIlovethebomb@lemm.eelinkfedilinkEnglisharrow-up1·8 months agoDo they not have power outside the city where you live or something?
minus-squareSupraMario@lemmy.worldlinkfedilinkEnglisharrow-up1·8 months agoYou do know what rural is right? Power is not always available right away, and usually isn’t when they first start.
Almost everyone of them is done with a generator. Or they’re done with the crane and inspections for power have been completed and the crane is no longer needed.
Dude, you’re full of shit. Every construction site I’ve been on has had site power.
Cool, sounds like you’ve never stepped foot outside of the city.
Do they not have power outside the city where you live or something?
You do know what rural is right? Power is not always available right away, and usually isn’t when they first start.