It’s been a while since we’ve had a launch from ISRO!
Mission info
Scheduled for (UTC) | 2024-08-16, 03:47 |
---|---|
Scheduled for (local) | 2024-08-16, 09:17 (IST) |
Launch site | First Launch Pad, Satish Dhawan Space Centre, India |
Launch Vehicle | SSLV |
Payloads | EOS-08 and Space Rickshaw-0 |
Payload mass | 175.0 kg |
Mission success criteria | Successful delivery of payloads to LEO |
Webcasts
Stream | Link |
---|---|
ISRO | https://www.youtube.com/watch?v=DRmxoAb6vlo |
Space Affairs | https://www.youtube.com/watch?v=o12UhwZY4gQ |
Spaceflight Now | |
The Launch Pad | https://www.youtube.com/watch?v=gfmC4Z9Ms9U |
The Space Devs |
Stats
Sourced from NextSpaceflight:
☑️ 1st SSLV mission this year, 3rd overall
☑️ 3rd ISRO mission this year, 94th overall
Mission details
Earth observation micro-satellite for ISRO designed to test new technologies for building an Earth observation satellite in a micro-satellite bus. The satellite hoists an Electro-Optical Infrared Payload (EOIR) for Earth observation, a Global Navigation Satellite System-Reflectometry payload (GNSS-R) for weather studies, and an UV Dosimeter to measure UV radiation in low Earth orbit.
Other payload includes the cubesat Space Rickshaw-0.
Stage 2 separation and Stage 3 ignition confirmed.
Stage 3 burn completed, and entering another coast phase.
Liftoff!
SR-0 cubesat separation confirmed! Launch success!
Stage 2 shutdown confirmed, and entered a coast phase.
EOS-08 payload separation confirmed!
Stage 3 separated, Stage 4 (velocity trimming module) burn completed.
Stage 1 separation, Stage 2 ignition, and fairing separation confirmed.
ISRO webcast is live. Madhuri Pillala is hosting.
https://x.com/isro/status/1824017646335250499
SSLV-D3/EOS-08 Mission
The launch of the third developmental flight of
🚀SSLV can be watched LIVE on
📆August 16, 2024, from
🕘08:50 Hrs. IST onISRO Website https://isro.gov.in
ISRO Facebook https://facebook.com/ISRO
ISRO YouTube channel
https://youtube.com/live/DRmxoAb6vlo?feature=share
and @DDNational@DrJitendraSingh