• Lugh@futurology.todayOPM
    link
    fedilink
    English
    arrow-up
    19
    ·
    3 months ago

    Rough calculations suggest that, on current trends, adding 12 hours of storage to the entire US grid would cost around $500 billion and pay for itself within a few years. By contrast, upgrading the US transmission grid could cost $7 trillion over 20 years.

    Counterintuitively, electricity cables under the North Atlantic might be much more economical. It would not have the eminent domain and construction complexities of upgrading the US continental land grid. If this cost estimate is accurate, it may be much cheaper.

    Is it really much more secure though? Wouldn’t one well-placed underwater bomb knock it out of action for weeks or months?

    If security was your top priority, surely decentralized microgrids with widely dispersed battery grid storage would be much more effective?

    • voidx@futurology.todayM
      link
      fedilink
      English
      arrow-up
      8
      ·
      3 months ago

      There’s a similar project that would supply power from Australia-Asia that spans 4,600 km when completed. But such big projects could easily be caught up in various delays, and it’s a problem if a country is too dependent on a single power link. Self-reliant renewable energy production definitely seems more secure.

    • styxem@sh.itjust.works
      link
      fedilink
      English
      arrow-up
      3
      ·
      edit-2
      3 months ago

      I’m very skeptical of the actual benefit of something like this.

      The 6GW system would be made up of pairs of cables stretching about 3,500km across the North Atlantic.

      I don’t see much benefit unless this becomes cheaper than the cost of building and running the equivalent generation (about two large plants.) Ohio’s data center load alone is projected to increase by about 4.5 GW by 2030.

      If security was your top priority, surely decentralized microgrids with widely dispersed battery grid storage would be much more effective?

      I’d say so, and it seemed like that was the way the industry was trending about 10 years ago but it seems like the large data center demand stalled that considering some of the facilities could use their own generation plant. Plus, the United States already has a precedent of substations being taken down by gun toting idiots.

    • Valmond@lemmy.world
      link
      fedilink
      English
      arrow-up
      9
      ·
      3 months ago

      😁 you don’t transport electricity at low voltages like that, because the loss is bigger. In France there is roughly 400.000 volt lines, they get split up in 200.000v then 63.000 IIRC etc etc down to 230v (220, 230, 240 I never remember which country has which).

      So no problem there.

  • Destide@feddit.uk
    link
    fedilink
    English
    arrow-up
    2
    ·
    3 months ago

    As a layman could this be used as a pipeline for mid Atlantic renewables like if we made a big ol wave/wind/solar farm island

    • Pup Biru@aussie.zone
      link
      fedilink
      English
      arrow-up
      4
      ·
      3 months ago

      once you lay deep sea cable, afaik you don’t really touch it again… it’s better to just lay another one

  • geography082@lemm.ee
    link
    fedilink
    English
    arrow-up
    1
    arrow-down
    14
    ·
    edit-2
    3 months ago

    “Share”. Looks like is not enough with all that EU has sucked from the Americas.

    • Kecessa@sh.itjust.works
      link
      fedilink
      English
      arrow-up
      2
      arrow-down
      1
      ·
      3 months ago

      The cost of the USA for the world since WW2 is certainly a lot more than what the rest of the world “sucked” from the Americas.

    • Valmond@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      3 months ago

      Well you got your northstream pipeline blewn up, no need to be jealous for other countries projects that work.