I’m talking out of my ass here, but having worked on naval-adjacent projects as an electrician, we were asked to ignore vast aspects of our code for the sake of space. One project that we ended up selling off to another contractor was a refueling building for a sub, where all the utilities had to be ran in the walls, which required drastic under sizing of all of our conduits, sometimes to a dangerous degree.
I’m talking out of my ass here, but having worked on naval-adjacent projects as an electrician, we were asked to ignore vast aspects of our code for the sake of space. One project that we ended up selling off to another contractor was a refueling building for a sub, where all the utilities had to be ran in the walls, which required drastic under sizing of all of our conduits, sometimes to a dangerous degree.
lol good grief